Linden Golf & Country Club
Maintenance
Menu
  • Practice Areas
    • Bunker
    • Photo album
    • Chipping Green
    • Putting Green
  • Tees
  • Course closures
  • Cart Shed
    • Preparation
  • Equipment
    • John Deere
    • Fairway Mower
  • Course conditions
    • Heavy Rain
    • Course during heavy
    • Drainage
  • Efficiency
    • Mechanical Work
    • Grinding
    • Sprayer
    • Sanding
    • Irrigation System
  • Aeration
    • DryJect
    • Deep Tine Aeration
    • Spring Aeration
    • Fall Aeration
  • Cart Paths
  • Our work schedule
    • Monday
    • Tuesday
    • Wednesday
    • Thursday
    • Friday
    • Saturday
    • Sunday
  • Frost Delays
    • Our crew and frost
  • Spraying
  • Pump Station & Well
    • Wet well
    • Foundation
    • Stem Wall Forms
    • Filling the vault
    • Pouring the slab
    • Pump Station
    • Pump House
    • Eletrical
    • Diver
    • Pump station painted
  • Tree maintenance
    • European Cottonwood
  • Distribution System
    • Hole 1
    • Hole 2
    • Hole 3
    • Hole 4
    • Hole 5
    • Hole 6
    • Hole 7
    • Hole 8
    • Hole 9
    • Putting Green
    • Chipping Green
    • Sprinkler Yardage
  • Lake on 5 cart path
    • Shaping the edges
  • Bunker Repair
    • Bunker Repair
    • Hole 2
    • Hole 4
    • Hole 8
  • 5th fairway
  • Clubhouse Drain
    • Drain
  • Updates
  • Advance Program
  • Weather

Hole 4

We removed most of the old sand and shaped the bunker in preparation for sand.

We have started to refill the bunker with sand.

The bunker has been refilled and raked. It will be soft for a while but fluffy.

We have stripped the contaminated sand out of the back bunker on 4. We will start to add sand and contour the bunker. 