Linden Golf & Country Club
Maintenance
Menu
  • Course closures
  • Cart Shed
    • Preparation
  • Equipment
    • John Deere
    • Fairway Mower
  • Course conditions
    • Heavy Rain
    • Course during heavy
    • Drainage
  • Efficiency
    • Mechanical Work
    • Grinding
    • Sprayer
    • Sanding
    • Irrigation System
  • Aeration
    • DryJect
    • Deep Tine Aeration
    • Spring Aeration
    • Fall Aeration
  • Cart Paths
  • Our work schedule
    • Monday
    • Tuesday
    • Wednesday
    • Thursday
    • Friday
    • Saturday
    • Sunday
  • Frost Delays
    • Our crew and frost
  • Spraying
  • Pump Station & Well
    • Wet well
    • Foundation
    • Stem Wall Forms
    • Filling the vault
    • Pouring the slab
    • Pump Station
    • Pump House
    • Eletrical
    • Diver
    • Pump station painted
  • Tree maintenance
    • European Cottonwood
  • Distribution System
    • Hole 1
    • Hole 2
    • Hole 3
    • Hole 4
    • Hole 5
    • Hole 6
    • Hole 7
    • Hole 8
    • Hole 9
    • Putting Green
    • Chipping Green
    • Sprinkler Yardage
  • Lake on 5 cart path
    • Shaping the edges
  • Bunker Repair
    • Bunker Repair
    • Hole 2
    • Hole 4
    • Hole 8
  • 5th fairway
  • Clubhouse Drain
    • Drain
  • Updates
  • Advance Program
  • Weather

Trench on 5

Keith is about half way down the trench at this point.

You can see the left side of the trench face being cut in this picture.

Here is Keith loading one of the workmans up.

You can start to see the final grade in this picture.

Slope is looking pretty good in this picture.

What a mess we were making

We finished most of the shaping of the trench down on five last week. We still have to clean it up  a little bit and seed it as soon as the weather allows.

Share this page

  • Share on Facebook
  • Share on Twitter