Linden Golf & Country Club
Maintenance
Menu
  • Practice Areas
    • Bunker
    • Photo album
    • Chipping Green
    • Putting Green
  • Tees
  • Course closures
  • Cart Shed
    • Preparation
  • Equipment
    • John Deere
    • Fairway Mower
  • Course conditions
    • Heavy Rain
    • Course during heavy
    • Drainage
  • Efficiency
    • Mechanical Work
    • Grinding
    • Sprayer
    • Sanding
    • Irrigation System
  • Aeration
    • DryJect
    • Deep Tine Aeration
    • Spring Aeration
    • Fall Aeration
  • Cart Paths
  • Our work schedule
    • Monday
    • Tuesday
    • Wednesday
    • Thursday
    • Friday
    • Saturday
    • Sunday
  • Frost Delays
    • Our crew and frost
  • Spraying
  • Pump Station & Well
    • Wet well
    • Foundation
    • Stem Wall Forms
    • Filling the vault
    • Pouring the slab
    • Pump Station
    • Pump House
    • Eletrical
    • Diver
    • Pump station painted
  • Tree maintenance
    • European Cottonwood
  • Distribution System
    • Hole 1
    • Hole 2
    • Hole 3
    • Hole 4
    • Hole 5
    • Hole 6
    • Hole 7
    • Hole 8
    • Hole 9
    • Putting Green
    • Chipping Green
    • Sprinkler Yardage
  • Lake on 5 cart path
    • Shaping the edges
  • Bunker Repair
    • Bunker Repair
    • Hole 2
    • Hole 4
    • Hole 8
  • 5th fairway
  • Clubhouse Drain
    • Drain
  • Updates
  • Advance Program
  • Weather

Framing

The first wall going up!

At this point they were half way through the walls. They are just starting to frame in one of two doors.

All four walls are up and the trusses are as well. They started to put the plywood up after this.

Mostly finished just need to install a few more things. We still need to get the door, siding and roofing on.

We will install insulation and plywood to finish off the inside.

The pump house framing has been finished and it is really starting to take shape. I have added a few pictures of the process with descriptions. 

Share this page

  • Share on Facebook
  • Share on Twitter